Bunnings

Sign in or sign up

No Bunnings account? Sign up
PowerPass customer?
Visit the dedicated trade website

Project list

Sign in to your account

A smooth white plaster arch.

Overview

Plastering an arch is a rewarding project that can elevate the look of any space. Whether you're building a new feature or updating an existing one, this guide will walk you through the process step-by-step to help you achieve a professional finish.

Safety tip: Always wear the appropriate safety equipment (safety glasses, gloves, ear muffs and a mask, for example) and always follow the instructions for the product or equipment.

Steps

1Remove existing plaster and angles

Start by carefully removing any existing plaster and external angles around the arch. Use a hammer along with a pry bar or wrecking bar to gently pull away the old materials. If any screws are holding them in place, remove those first. Clear the area back to the framing to make room for your new arch mould and plasterboard.

A person wearing gloves is using a pry bar to remove any existing plaster and external angles around the arch.

2Mark and cut the arch shape from MDF

Start by measuring the width of your wall opening, then cut a piece of MDF sheet into a square using that measurement. Find the centre point of the square and hammer in a screw or nail. To draw your arch, use either a strip of masonite or a piece of string. Tie one end of the string to the centre screw and the other to a pencil, then swing the pencil in an arc from one edge of the MDF to the other. This will give you a smooth, symmetrical arch shape.

A person is using a pencil and a straight edge to mark measurements on a MDF.

3Create and smooth the MDF arch pieces

Once the arch shape has been marked, cut along the curved line with a jigsaw. Repeat this process to create four identical pieces—two for each side of the arch mould. When all pieces are cut, use sandpaper to smooth the curves and remove any rough spots or bumps. This will help your arch come together neatly in the next steps.

A person is cutting an arch shape out of an MDF sheet with a jigsaw.

4Assemble and install the arch mould

Measure the depth of your wall opening, factoring in the thickness of the MDF sheet and the plaster layers. Cut pine blocks to suit and use them to join two of the MDF arch shapes together, forming one side of the arch mould. Place the pine blocks around the outside edges so you can screw the arch into position. With the mould fully assembled, fit it into the wall opening and secure it in place using timber screws.

A person is using a drill to secure and MDF arch to wooden support blocks with screws.

5Install plasterboard to the inside of the arch

Begin by measuring and cutting a strip of plasterboard to line the inner curve of the arch. To bend the plasterboard, score the back every 20 to 30 millimetres using a sharp utility knife. This will allow it to flex without cracking. Starting from one end of the arch, screw the plasterboard into place, spacing each screw approximately 100 millimetres apart. Gently work your way around the curve until the board is fully secured.

A person wearing black gloves is using a utility knife to score lines on the back of a plasterboard strip every 20 to 30 millimetres.

6Fix plasterboard to the face of the arch

Begin by measuring the height and width of your arch. Using these measurements, cut a square piece of plasterboard to fit over the front face of the arch. Position it in place and fix it using screws, spaced approximately every 100 millimetres.

A person wearing black gloves is using a utility knife and a straight edge to cut a square piece of plasterboard to fit over the front face of the arch.

7Cut out the arch shape from the plasterboard

With the plasterboard secured, use a plaster saw to carefully cut out the arch shape from the inside. Work slowly and follow the curve as closely as possible to achieve a clean, accurate cut that matches the arch frame underneath.

A person in a red shirt is cutting an arch shape from a plasterboard using a hand saw.

8Install external moulding for a neat finish

To create a clean and durable edge along the outer curve of your arch, install a flexible plastic external moulding. Plastic is ideal for this job because it can be easily notched to follow the curve without kinking. Use a utility knife to carefully score the back of the moulding at regular intervals—this will allow it to bend smoothly around the arch. Once shaped, position the moulding along the edge where the curved plasterboard meets the face of the wall, then staple it directly to the plasterboard, spacing the staples approximately every 100 millimetres. Make sure the arch moulding sits flush and follows the curve evenly to create a sharp, professional finish once plastered.

A Bunnings Team Member is installing a flexible plastic external moulding along the edge of a plaster archway.

9Prepare the surface for plaster

Before applying plaster, it’s important to prepare the area to ensure it adheres well. Lightly score the painted surfaces near the joints in a criss-cross pattern using your scraper. Then apply jointing tape along the joins and over the moulding edges. This will help create a seamless base for your plaster.

A Bunnings Team Member is pressing joining tape along the joins and over the moulding edges.

10Apply the first coat of plaster

Mix your plaster following the manufacturer’s instructions. If you're using a powdered version, stir it with water in a clean bucket until it reaches a smooth, creamy consistency. Be sure to only mix what you can apply within the plaster’s working time. Using a trowel, apply a thin, even coat across the surface of the arch, starting at the top and working your way down. For the curved edges, switch to a corner trowel to maintain the shape. Take your time and apply the plaster carefully to cover all areas.

A Bunnings Team Member is applying plaster across the surface of the arch using a trowel and a hawk.

11Apply the second and top coats

Once your first coat is completely dry, scrape back any bumps or high spots with a scraper. Then apply a second thin coat, using the same technique. Let this dry fully before moving on to the final top coat. Feather out the top coat at the edges to blend it into the surrounding wall for a smooth, seamless finish. As always, allow it to dry completely before the next step.

A Bunnings Team Member is smoothing plaster above an archway to blend it into the surrounding wall using a trowel.

12Sand and prepare for painting

When the final coat is dry, lightly sand the entire area using a sanding block or pole to remove any imperfections. Make sure the surface is smooth and dust-free before you begin painting.

A Bunnings Team Member wearing safety glasses is sanding the wall using a sanding block to remove any imperfection.

13Now that you’ve plastered an arch…

Health & Safety

Please make sure you use all equipment appropriately and safely when following the advice in these D.I.Y. videos. You need to be familiar with how to use equipment safely and follow the instructions that came with the equipment. If you are unsure, you may feel it is safest to consult an expert, such as the manufacturer or an expert Bunnings Team Member.

Grave health hazards are linked to asbestos, which may be in homes built up to 1990. Health hazards may result from exposure to lead-based paints in older materials and copper chromium arsenic (CCA) treated timber. For information on the dangers of asbestos, lead-based paint and CCA treated timber and tips for dealing with these materials contact your local council's Environmental Health Officer.